Do you need an electrical panel upgrade for solar?
Many older Bay Area homes do. The 120 percent rule, the warning signs, and the cheaper alternatives that sometimes avoid a full upgrade.
In this article
- You need an upgrade when your panel cannot safely accept solar's backfeed under the 120 percent rule, or when the panel is old, full or unsafe.
- Homes with 100A service or a busbar rated the same as the main breaker often hit the limit. Many pre-1970s San Francisco homes fit that description.
- Alternatives such as main breaker derating, a supply-side tap or load management can sometimes avoid a full upgrade.
Your main electrical panel is where utility power enters the house and splits into circuits. Solar adds a second source of power feeding into that same panel. If the panel was not built to handle both, the electrical code requires a fix before solar can be connected. Here is how to tell whether that applies to your home.
The 120 percent rule
Each panel has a busbar, the metal spine that carries current to the breakers, with an amp rating. The National Electrical Code lets the main breaker plus the solar breaker add up to no more than 120 percent of the busbar rating, when the solar breaker sits at the opposite end of the bar from the main.
| Busbar rating | Main breaker | 120% limit | Room for a solar breaker |
|---|---|---|---|
| 100A | 100A | 120A | 20A |
| 125A | 100A | 150A | 50A |
| 200A | 200A | 240A | 40A |
| 225A | 200A | 270A | 70A |
The pattern matters: a 200A panel with a 200A main has room for only a modest solar breaker, and a 100A panel has very little. Adding a battery, which also backfeeds the panel, uses up the same headroom.
Signs you probably need an upgrade
- Your service is 100A or less, common in older San Francisco and East Bay homes.
- The panel is full, with tandem breakers squeezed in to make room.
- It is a brand with a known safety history, such as some Federal Pacific or Zinsco panels.
- You are electrifying: a heat pump, induction range or EV charger is on the list along with solar.
- Breakers trip often, or the panel is warm, corroded or buzzing. Call an electrician now, solar or not.
Your options, from least to most work
| Option | What it does | When it fits |
|---|---|---|
| Main breaker derate | Swaps the main breaker for a smaller one to free headroom | Your actual load is well below the service rating |
| Supply-side (line-side) tap | Connects solar before the main breaker, bypassing the busbar limit | The meter panel has room and the utility allows it |
| Load management or smart panel | Actively limits large loads so the service is not overloaded | You are adding EV charging or electric heat without enough capacity |
| Main panel upgrade | Replaces the panel, often moving to 200A, sometimes with new service from PG&E | Old, unsafe or full panels, or a full electrification plan |
Will your panel take solar as is?
A photo of the panel label is often enough for a first answer.
Where smart panels fit
Smart panels such as SPAN replace or sit beside the main panel and let software monitor and switch individual circuits. They can make backup power smarter, shedding the dryer during an outage so a battery lasts longer, and some can manage loads to avoid a service upgrade. They cost more than a standard panel, so they make most sense when you want circuit-level control along with solar and storage.
What a panel upgrade involves
- Load calculation to size the new service for today's and planned loads.
- Permit from your city, and a service request to PG&E if the service size or meter changes.
- Installation day, usually one day of power shutoff for the swap itself.
- Inspection by the city, then PG&E reconnects and the solar work can proceed.
The slowest step is often PG&E scheduling when the service itself must change. Planning the panel together with solar and storage avoids paying for two separate permits and two shutoffs.